n some cases, we may need to monitor
the hart parameter from the HART-enabled instrument such as transmitters and
control valve. In this article, I would like to show how to configure Tri-Loop™
HART-to-Analog Signal Converter which is configured as an instrument that
monitors control valve travel.
This configuration is done on the
workbench (workshop).
In my case, I used the following
equipment:
- Tri-Loop™ HART-to-Analog Signal Converter
- FIELDVUE DVC6010 positioner
- Fluke 787 processmeter
- Handheld 375 HART communicator
- Jofra ASC300 4-20mA Signal source
- 24VDC Power Supply
- 250/270W resistor
- Wires
- Screw drivers
Connect all equipment as shown in
the figure 1.
After all instruments are
interconnected as figure 1. perform the following steps:
HART TRI-LOOP CONFIGURATION
Online with HART Tri-Loop by HART Comm.
Online with HART Tri-Loop by HART Comm.
Configure Tri-Loop’s parameters as
shown at the following menu from HART COMM.
• Basic Setup
• Configure Channels
• Configure CH1
• Burst Variable QV
• Units %
• LRV 0
• URV 100
• CH1 Enabled YES
• Basic Setup
• Configure Channels
• Configure CH1
• Burst Variable QV
• Units %
• LRV 0
• URV 100
• CH1 Enabled YES
Configure Tri-Loop address with “1”
• Device Setup
• Detailed Setup
• HART Output
• Poll Address 1
• Device Setup
• Detailed Setup
• HART Output
• Poll Address 1
Perform loop test of CH1 with the
following menu from HART Comm.
• Device Setup
• Detailed Setup
• Output Condition
• Loop Test
• Device Setup
• Detailed Setup
• Output Condition
• Loop Test
DVC6010 CONFIGURATION
Online with dvc6010 by HART Comm.
Online with dvc6010 by HART Comm.
Put DVC6010 into “OUT OF SERVICE”
mode
• Setup & Config.
• Detailed Setup
• Instrument Mode
• Out of Service
• Setup & Config.
• Detailed Setup
• Instrument Mode
• Out of Service
Enable BURST mode and other
parameters
• Setup & Config.
• Detailed Setup
• Burst Mode
• Burst Enabled
• Enable
• Burst Command
• HART Univ. Cmd. 3
• Select Cmd. 3 Press.
• Output A
• Setup & Config.
• Detailed Setup
• Burst Mode
• Burst Enabled
• Enable
• Burst Command
• HART Univ. Cmd. 3
• Select Cmd. 3 Press.
• Output A
Change DVC device address to “2” (optional)
Enable BURST mode and other parameters
• Setup & Config.
• Detailed Setup
• General
• Polling Address: 2
Enable BURST mode and other parameters
• Setup & Config.
• Detailed Setup
• General
• Polling Address: 2
Put DVC6010 into “IN SERVICE”
• Setup & Config.
• Detailed Setup
• Instrument Mode
• In Service
• Setup & Config.
• Detailed Setup
• Instrument Mode
• In Service
FUNCTION TEST
After all parameter both TRI-LOOP and DVC6010 has been properly set, perform function test by
After all parameter both TRI-LOOP and DVC6010 has been properly set, perform function test by
- Online with DVC6010 by HART comm
- Monitor “travel” percentage parameter at the HART comm..
- Move DVC6010 travel sensor
- Observe mili ampere output from channel 1 at the mili ampere meter.
- The percentage of 4-20mA output from TRI-LOOP should be equal to travel position shown in the HART COMM.
Now you can bring your instrument
for installation.
Hope this help, or leave it just a
reading material…
Tidak ada komentar:
Posting Komentar